DAM INSTRUMENTATION AND SAFETY MONITORING
TYPICAL PROJECT PROFILE DAM INSTRUMENTATION AND SAFETY MONITORING Phu Kham Copper-Gold Project Phu Bia Mine Ltd – Lao PDR The Project Geotech International is currently providing turn-key supply of instrumentation, installation and monitoring for the highest tailings dam in Asia. The mine is reported to provide 30% of the total amount of the export earnings of the Lao PDR. The  dam  is  being  built  in  stages  over  a  multi-year  life-of-mine  period.  Thus  all  instrumentation  cabling  and monitoring installations have to be able to be raised as the height of the dam increases over time. The Services Provided Past and on-going work includes: Design of performance monitoring instrumentation and readout system Procurement of instrumentation  Installation of instrumentation Installation of automated readout and telemetry services On-going operation and maintenance support on a 24 hour turn-around basis Up-dating of the instrumentation over time as new measurement requirements are established by the mine’s dam performance Consulting Board of Experts
Phu Kham Mine Tailings Dam – Lao PDR
Geotech International performing geotechnical investigation and instrumentation installation at Phu Kham Mine tailings dam using Geotech International Boart Longyear drilling equipment - Lao PDR
Instrument installation and dam performance monitoring at Phu Kham mine tailings dam All capable of being raised as the elevation of the dam is increased over time - Lao PDR
Download Document  in PDF Format
Geotech International Pte. Ltd.
E-mail: geotech@geotechinternational.com     Tel: (84-24) 3513-2763;  Mobile: 090 343 3326